In Saint-Malo, a new chapter opens with the demolition of seven houses on the site of the old station. This ambitious project aims to replace these buildings with two new apartment buildings, which will contribute to the urban evolution of the city. At the same time, a micro-crèche and a community center will enrich the service offerings for residents, thus marking a significant turning point in the real estate development of the region.

In Saint-Malo, a major urban renewal project is underway with the demolition of seven houses. This site, located near the train station, aims to transform the urban landscape by integrating new housing. The old constructions, which needed a serious facelift, are making way for two new modern buildings. This operation is part of a broader revitalization plan for the neighborhood and aims to provide residents with an improved living environment.
Table of Contents
ToggleChallenges of the real estate project
This real estate project addresses several sustainable development challenges. The eradication of dilapidated buildings not only allows for the creation of modern and functional spaces but also integrates a micro-crèche and a community center. Indeed, these structures are essential for enhancing social cohesion. The 350 future housing units planned as part of the renewal program will offer alternatives in terms of both social housing and free access, thus promoting social diversity in this dynamic neighborhood.
A greener future for the neighborhood
This construction site is not limited to merely building apartments. A large green space will also be landscaped to complete this urban ecosystem. This initiative is part of a desire to make Saint-Malo more attractive while preserving the environment. The new infrastructures will contribute to beautifying the neighborhood and improving the living conditions for Malouins, thus fostering the development of the local economy.